Electrical Trim-out 2, kitchen backsplash, attic demolition 
(Morning) Starting installation of tile over laundry area
(Morning) Starting installation of tile over laundry area
Viewed: 63 times.

Reggie and his assistant installing the gas line for the cooktop
Reggie and his assistant installing the gas line for the cooktop
Viewed: 56 times.

Installing grill over the breakfast area register
Installing grill over the breakfast area register
Viewed: 61 times.

Electricians shortened the hallway pendant lights
Electricians shortened the hallway pendant lights
Viewed: 48 times.

Laundry backsplash was completed
Laundry backsplash was completed
Viewed: 55 times.

Stove area tile is done; Primo is singing as he applies adhesive to another tile
Stove area tile is done; Primo is singing as he applies adhesive to another tile
Viewed: 56 times.

Holes for the pendant light bases have been drilled
Holes for the pendant light bases have been drilled
Viewed: 42 times.

Viewed: 49 times.

Electrical and gas for the cooktop have been brought down into the cabinet
Electrical and gas for the cooktop have been brought down into the cabinet
Viewed: 40 times.

Drain setup for the kitchen sink and disposal.  It's not quite complete yet.
Drain setup for the kitchen sink and disposal. It's not quite complete yet.
Viewed: 53 times.

Per code, the recessed can light over the laundry area has to have a cover.
Per code, the recessed can light over the laundry area has to have a cover.
Viewed: 44 times.

Viewed: 49 times.

Viewed: 46 times.

The shower valve trim and spout have been installed.
The shower valve trim and spout have been installed.
Viewed: 53 times.

Master bathroom is clean and awaiting hardwood floor
Master bathroom is clean and awaiting hardwood floor
Viewed: 54 times.

Front guest bedroom has also been cleaned out and vacuumed.
Front guest bedroom has also been cleaned out and vacuumed.
Viewed: 61 times.

Powered by Gallery v1 RSS