(Morning) Starting installation of tile over laundry area
Viewed: 63 times.
|
Reggie and his assistant installing the gas line for the cooktop
Viewed: 56 times.
|
Installing grill over the breakfast area register
Viewed: 61 times.
|
Electricians shortened the hallway pendant lights
Viewed: 48 times.
|
Laundry backsplash was completed
Viewed: 55 times.
|
Stove area tile is done; Primo is singing as he applies adhesive to another tile
Viewed: 56 times.
|
Holes for the pendant light bases have been drilled
Viewed: 42 times.
|
|
Electrical and gas for the cooktop have been brought down into the cabinet
Viewed: 40 times.
|
Drain setup for the kitchen sink and disposal. It's not quite complete yet.
Viewed: 53 times.
|
Per code, the recessed can light over the laundry area has to have a cover.
Viewed: 44 times.
|
|
|
|
The shower valve trim and spout have been installed.
Viewed: 53 times.
|
Master bathroom is clean and awaiting hardwood floor
Viewed: 54 times.
|
Front guest bedroom has also been cleaned out and vacuumed.
Viewed: 61 times.
|