Primo started cutting away the drywall to install hardibacker for the tile backsplash
Viewed: 67 times.
|
SolarTex guy cutting the hole for a solar tube
Viewed: 69 times.
|
Bottom (room-facing) part of the solar tube
Viewed: 66 times.
|
My god, it's full of stars!
Viewed: 45 times.
|
Master bedroom electrical sockets and light/fan switches have been installed
Viewed: 66 times.
|
Sockets on back wall
Viewed: 39 times.
|
Socket between the closet doors
Viewed: 31 times.
|
Integrated smoke detector
Viewed: 41 times.
|
Master suite hallway light switch
Viewed: 39 times.
|
Pendant lights and smoke detector in main hallway. The pendants are too long and need to be shortened tomorrow.
Viewed: 71 times.
|
Kitchen lights and power socket
Viewed: 38 times.
|
More power sockets and switches on wall between kitchen and dining room
Viewed: 41 times.
|
|
Start of backsplash tile work
Viewed: 74 times.
|
Power and water in fridge recess
Viewed: 40 times.
|