Some of the grout is still wet, and will lighten as it dries.
Viewed: 127 times.
|
All of this will look a lot better once the cardboard is removed from the countertops.
Viewed: 167 times.
|
The workers installed our Advantium and our oven (Dacor), but didn't hook up the electrical
Viewed: 164 times.
|
|
Also, in the last two days they finished texturing and painting the crooked wall in the fridge recess.
Viewed: 119 times.
|
The plumbers came by at some point and finished hooking up the kitchen sink drain. They also added a supply line for the dishwasher and drilled a hole in the side wall of the cabinet to allow the dishwasher drain tube to pass (and connect into the disposal).
Viewed: 165 times.
|
The dishwasher supply line.
Viewed: 154 times.
|
They moved the bench seats into the garage, to make room for the flooring installation.
Viewed: 118 times.
|
We need to figure out how to cap or trim out the ugly PVC access port for the laundry drain. Theoretically it's required by code so they can run a snake into the laundry drain if necessary.
Viewed: 150 times.
|
There's a mysterious wire hanging out at the base of the laundry cabinet, near the bay window. I have no idea when it first showed up or what it does. I need to do some research and look at previous construction photos.
Viewed: 146 times.
|
The ceiling fan for the master bedroom and the bathroom fan for the master bath. They somehow misplaced the original bathroom fan, so they instructed us to get a replacement.
Viewed: 147 times.
|
The wood floor adhesive has been delivered.
Viewed: 144 times.
|